Road work expected to snarl traffic starting Monday

The Progreso exchange on the highway loop will be a construction site for the next 10 months. Photo: Sipse

Road work begins Monday at the Progreso exit on the Periférico.

The interchange was built in 1994, and is one of the most complicated for drivers because of traffic volume, reports Diario de Yucatán. It will be an even bigger headache for drivers during its 10-month construction schedule.

But in the end, the number of lanes will double, from two to four each way, said Jorge Montaño Michael of the state transportation department.

The interchange was built in 1994, and is one of the most complicated for drivers because of traffic volume, reports Diario de Yucatán.

Yucatán Magazine
Yucatán Magazine
Yucatán Magazine has the inside scoop on living here. Sign up to get our top headlines delivered to your inbox every week.
- Advertisement -spot_img
AVAILABLE NOWspot_img
ADVERTISEMENTspot_img
Verified by ExactMetrics